Barclays Arena NYC Transit Improvements – Brooklyn, NY

John Civetta & Sons, Inc. constructed an addition to the Atlantic Avenue LIRR/NYCT Subway station adjacent to the Barclays Arena. The project included a major subway demolition, structural alterations and existing beam/column restorations and replacements on active tracks. Shoring and structural lifting were also required. Excavation, caisson installation, concrete and electrical work were also performed, along with all of the required finish trades. An extensive amount of work was performed under the NYCTA flag and on general order track outages.

Triangle Park/AIDS Memorial Park – Greenwich Village, NY

Project Name: Triangle Park/AIDS Memorial Park (Greenwich Village, New York, NY)

Date of Project:  December 2016 Completion

Project Description: The contract work entailed reconstruction of the St. Vincent Triangle Park, across from the former St. Vincent’s Hospital on Seventh Avenue in Greenwich Village, along with the installation of the AIDS Memorial Park. The work involved demolition of existing St. Vincent Hospital facilities, backfilling site, and installation of a new Triangle Park and AIDs Memorial. The new construction included installation of underground drainage, landscaping, furnishing and installing of granite curbing and asphalt pavers, park lighting and furnishings as required. For the AIDs Memorial, we furnished and installed the Cold Spring granite pavers and fountain and the new, award-winning AIDS memorial structure. 

Links:  http://nycaidsmemorial.org/faq/#faq4 

one vanderbilt excavation

One Vanderbilt Avenue – New York, NY

Project Name: One Vanderbilt Avenue (1 Vanderbilt Avenue, New York, NY)

Date of Project:  October 2016 Project Began

Project Description: This project involved construction of a high-capacity deep foundation in the highly congested area adjacent to Grand Central Terminal; the building was proposed as part of the re-zoning of Mid-Town East, and upon completion will be the fourth tallest building in NYC. Notably, the One Vanderbilt Avenue project necessitated what is believed to be the largest continuous concrete pour in Manhattan – 4200 yards. The project also entailed the removal and replacement of the subway roof and ventilators over the NYCT Shuttle Station at One Vanderbilt Avenue / Grand Central Station.

Links:  https://nypost.com/2016/10/19/de-blasio-joins-ceremony-for-citys-second-tallest-skyscraper/

Dyer Avenue Bridge Deck Replacement – New York, NY

Project Name: Dyer Avenue Bridge Deck Replacement (Dyer Avenue & 31st Street)

Date of Project:  May 2016 Completion

Project Description: This project involved the full concrete deck replacement, steel repairs, abatement and painting of the Dyer Avenue Bridge over the western approach to Penn Station in New York City. The project also included shielding over sixteen active Amtrak and LIRR main line tracks and overhead catenary lines. Built in 1955, the three-span Dyer Avenue Bridge spans over Amtrak and the LIRR tracks. It consists of steel girders and transverse floor beams that support a deck of prestressed panels. In order to satisfy the project’s requirements of not altering the final grade and not increasing the weight of the deck but also upgrading to an LRFD design, Stantec designed precast concrete-filled steel grating panels as the deck replacement system. 

Additionally, as a major entrance/exit from the Lincoln Tunnel, it was required that the roadway should be opened for traffic every morning. As a result, rapid-setting concrete was employed for all of the cast-in-place concrete pours. The construction procedure included removing two deck bays, placing the replacement sections and locking them into place via studs/rapid-setting concrete, allowing traffic on the bridge as soon as one hour after the concrete placement.

Links:  https://www.roadsbridges.com/new-york-expresswaydyer-avenue-bridge-re-decking-presents-unique-challenges

EDC Heritage Field – Bronx, NY

Project Name: EDC Heritage Field (Bronx, NY)

Date of Project:  2011

Project Description: The contract work entailed creating a sledding hill at the location of the old Yankee Stadium, Bronx, NY. The work specifically involved structural demotion, excavation, dewatering, and installation of a foundation for a precast walk.

Links:  https://www.nycedc.com/press-release/nycedc-and-department-parks-recreation-joined-new-york-yankees-break-ground-heritage